Ahad Rufaydah–Sha’ar Arterial Road Project via East of the Airport – Phase I (Remaining Works)
Ahad Rufaydah–Sha’ar Arterial Road Project via East of the Airport – Phase I (Remaining Works)
Sector
Infrastructure & Utilities
Location
Riyadh, Saudi Arabia
Project Details
Ahad Rufaydah–Sha’ar Arterial Road Project via East of the Airport – Phase I (Remaining Works)
Scope of Work
Construction of the main road from Station 0+975 to Station 4+000, including earthworks, sub-base and base layers, asphalt pavement, traffic control facilities, and drainage culverts.
Execution of earthworks, pavement foundation layers, and drainage culverts along the main road from Station 4+000 to Station 6+900, excluding asphalt pavement and traffic control facilities.
Construction of Ramp C connecting to King Abdullah Road.
Construction of Ramp D connecting to King Abdullah Road, including Wadi Bridge WB02 at Station 0+750 along the ramp.
Construction of an underpass at Station 2+750 on the main road to facilitate the future connection between King Faisal Medical City and the arterial road.
Construction of Wadi Bridge WB03 at Station 5+100 along the main road.
Construction of the eastern connection to Prince Sultan Road, including Ramp A, Turn-A, Ramp D, Turn-D, and a U-turn, covering earthworks, foundation layers, and drainage culverts, excluding asphalt pavement and traffic control facilities.